Hitachi 3 pipe VRF heat recovery air conditions were installed, within the second floor classrooms. For the main hall and wedding hall areas IVX multi Split systems were selected with void ducted mounted units.
ProjectDescription
The systems are connected to external condensing units located on the roof top plant areas.
The Hitachi systems were controlled from central controllers with an interface connected to the BMS system.
Additional to AC systems, Hitachi manufactured air cooled condensers had been selected to serve the DX coil on the fresh air AHU, to temper the fresh air provided to the main hall and wedding hall areas, these were supplied complete with interface kits.